Skip to content
View Categories

Create Invoice

1 min read

Understanding Automatic Invoice Creation #

In FieldAx, invoices generate automatically when jobs are completed, capturing all billable elements from the service visit.

Invoice Generation Trigger #

When Job is Closed/Completed

The moment a technician completes a job:

  1. Status changes to “Completed”
  2. System triggers invoice creation
  3. All job data transfers to invoice
  4. Invoice appears in “Draft” status

Automated Invoice Components #

Step 1: Invoice Header Creation #

System automatically populates:

Invoice Information

  • Invoice Number: INV-2024-0001 (auto-sequential)
  • Invoice Date: Job completion date
  • Customer: From job record
  • Billing Address: From customer account
  • Job Reference: JOB-2024-1234
  • Service Location: Where work performed

Payment Terms

  • Pulled from customer account
  • Default: Net 30
  • Due date calculated automatically

Step 2: Consumed Parts Addition #

All parts used during service automatically become line items:

Parts Line Items Example

Line 1: Capacitor 45MFD

– Quantity: 1

– Unit Price: $65.00 (from price book)

– Tax: $5.36 (8.25%)

– Line Total: $70.36

Line 2: Air Filter 20x25x1  

– Quantity: 2

– Unit Price: $18.00 (from price book)

– Tax: $2.97 (8.25%)

– Line Total: $38.97

Line 3: Refrigerant R410A

– Quantity: 3 lbs

– Unit Price: $45.00/lb (from price book)

– Tax: $11.14 (8.25%)

– Line Total: $146.14

Parts Integration Process:

  • Technician consumes parts via mobile app
  • System tracks quantity and source
  • Price book rates applied automatically
  • Tax calculated per line item

Step 3: Labor Hours from Time Cards #

Logged time automatically converts to labor charges:

Labor Line Items Example

Line 4: Regular Labor – John Smith

– Date: 07/15/2024

– Hours: 2.5

– Rate: $95.00/hour (from price book)

– Tax: $0.00 (labor non-taxable)

– Line Total: $237.50

Line 5: Overtime Labor – John Smith

– Date: 07/15/2024  

– Hours: 0.5

– Rate: $142.50/hour (1.5x from price book)

– Tax: $0.00 (labor non-taxable)

– Line Total: $71.25

Time Card Integration:

  • Technician logs time on mobile app
  • Start/stop times tracked
  • Overtime calculated automatically
  • Appropriate rates applied

Step 4: Travel Time Addition #

Travel hours become separate line items:

Travel Line Items Example

Line 6: Travel Time

– Date: 07/15/2024

– Hours: 0.75

– Rate: $75.00/hour (from price book)

– Tax: $0.00 (travel non-taxable)

– Line Total: $56.25

Travel Tracking:

  • GPS tracks travel start/end
  • Or manual entry by technician
  • Travel rate from price book
  • Billable per customer agreement

Step 5: Price Book Integration #

All pricing comes from job’s associated price book:

How Price Book Works

  • Job has assigned price book
  • Each customer can have specific price book
  • Price book contains:
    • Parts pricing with markups
    • Labor rates by type
    • Travel rates
    • Service charges

Price Hierarchy:

  1. Customer-specific price book (if exists)
  2. Job type price book
  3. Standard price book
  4. Default system pricing

Step 6: Tax Calculations #

Tax applied at line item level:

Tax Configuration

  • Taxable Items: Parts and materials
  • Non-Taxable: Labor and travel (varies by region)
  • Tax Rate: From customer location
  • Line-Level Calculation: More accurate

Tax Example:

Parts Subtotal: $255.47

Parts Tax (8.25%): $21.08

Labor Subtotal: $365.00

Labor Tax: $0.00

Invoice Total: $641.55

Invoice Review After Generation #

Accessing Auto-Generated Invoice #

  1. From completed job, click View Invoice
  2. Or navigate to Invoices tab
  3. Find draft invoice
  4. Open for review

Draft Status Features:

  • Full editing capability
  • Add/remove line items
  • Adjust quantities
  • Apply discounts
  • Add notes

Common Adjustments #

Adding Credits/Discounts

Line 7: First-Time Customer Discount

– Amount: -$50.00

– Tax: $0.00

– Reduces total due

Adding Special Charges

Line 8: Hazardous Material Disposal

– Amount: $25.00

– Tax: $2.06

– For refrigerant disposal

Warranty Adjustments

Line 9: Warranty Coverage Credit

– Amount: -$65.00

– For covered capacitor

– Customer pays difference only

Powered by BetterDocs

Leave a Reply

Your email address will not be published. Required fields are marked *

© 2023 Merfantz Technologies, All rights reserved.